Appendix 10-5 Preliminary Watercourse Crossing Inventory
pdf
Appendix 10-6 Groundwater Dependent Terrestrial Ecosystem (GWDTE) Assessment
pdf
Appendix 10-7 Preliminary Public Water Supply Assessment
pdf
Appendix 10-8 Preliminary Private Water Supplies Assessment
pdf
Appendix 10-9 Preliminary Flood Risk Assessment
pdf
Appendix 11-1 GHG Background Data
pdf
Appendix 12-1 LVIA Methodology
pdf
Appendix 12-2 Wirelines and Photography
pdf
Appendix 12-3 RVAA Wirelines
pdf
Appendix 13-1 Archaeological Desk-Based Assessment (ABDA)
pdf
Appendix 13-2 Initial Settings Report (Updated)
pdf
Appendix 14-1 Transport Assessment
pdf
Appendix 14-2 Outline Construction Traffic Management Plan
pdf
Appendix 15-1 Construction Noise and Vibration Report
pdf
Appendix 15-2 Wind Turbine Operational Noise Report
pdf
Appendix 15-3 Substation Noise Impact Assessment
pdf
Appendix 16-1 Construction Dust Assessent Procedure
pdf
Appendix 16-2 EPUK & IAQM Planning for Air Quality Guidance
pdf
Appendix 16-3 Proposed Approach to Modelling Impacts on Ecological Receptors
pdf
Appendix 17-1 Legacy Report on Maximising Benefits
pdf
Appendix 18-1 Baseline Data Tables
pdf
Appendix 20-1 Long list of Risk Events for Major Accidents and Disasters
pdf
Appendix 21-1 Predicted Shadow Flicker Events (Example)
pdf
Appendix 21-2 Consideration of Public Rights of Way
pdf
Appendix 23-1 Agricultural Land Classification (ALC) Report
pdf
Appendix 23-2 Groundsure Report
pdf
Appendix 24-1 Outputs of Stages 1 and 2 for the Assessment Inter-Project Effects
pdf
Preliminary Environmental Information Report (PEIR) – Figures
Figure 0 – Calderdale Energy Park PEIR Figures Contents
pdf
Figure 03-1 PIER Boundary
pdf
Figure 03-2 Turbine Area Boundary
pdf
Figure 03-3 Bradford West Cable Corridor
pdf
Figure 03-4 Western Access Route
pdf
Figure 03-5 Eastern Access Route
pdf
Figure 04-1 Construction Phase Infrastructure Layout (Atlas Map)
pdf
Figure 04-1 Construction Phase Infrastructure Layout
pdf
Figure 04-2 Operational and Maintenance Phase Infrastructure Layout (Atlas Map)
pdf
Figure 04-2 Operational and Maintenance Phase Infrastructure Layout
pdf
Figure 05-1 Infrastructure Areas at Scoping
pdf
Figure 05-2 Initial TCPA 2023 Scoping Layout – up to 65 Turbines
pdf
Figure 05-3 2025 Scoping Report Layout – up to 41 Turbines
pdf
Figure 05-4 PEIR Layout – 34 Turbines
pdf
Figure 05-5 Turbine Changes between the Scoping Layout (41 turbines) and the PIER Layout (34 turbines)
pdf
Figure 05-6 Grid Connection Cable Corridor Search Areas
pdf
Figure 05-7 Bradford West Cable Corridor Options 1 and 2
pdf
Figure 05-8 Rochdale Options 1 and 2
pdf
Figure 08-1 Study Areas Applied to the Turbine Area
pdf
Figure 08-2 Study Areas Applied to the Access Routes and Bradford West Cable Corridor
pdf
Figure 08-3 Habitat Survey Coverage
pdf
Figure 10-01 Study Area
pdf
Figure 10-02 Hydrological Setting
pdf
Figure 10-03a Water Framework Directive SW
pdf
Figure 10-03b Water Framework Directive GW
pdf
Figure 10-04a c Designated Sites
pdf
Figure 10-05a_c National Soil Map
pdf
Figure 10-06a_c Peaty Soils Location
pdf
Figure 10-07a_c Superficial Geology
pdf
Figure 10-08a_c Solid Geology
pdf
Figure 10-09a Hydrological Features
pdf
Figure 10-10 Peat Probe Depth and Core Locations
pdf
Figure 10-11 Estimated Peat Depth
pdf
Figure 10-12a_c Hydrogeological Regime
pdf
Figure 10-13 GWDTEs
pdf
Figure 10-14 Flood Alert & Warning Areas
pdf
Figure 10-15 FMfP
pdf
Figure 10-16 RoFSW PD
pdf
Figure 10-17 Reservoir Risk
pdf
Figure 10-18 RoFSW CC
pdf
Figure 12-1 Local Planning Authority Context
pdf
Figure 12-2-1 National Landscape Character
pdf
Figure 12-2-2 Local Landscape Character Legend
pdf
Figure 12-2-2 Local Landscape Character
pdf
Figure 12-3-1 Landscape Designations
pdf
Figure 12-3-2 Parks and Gardens
pdf
Figure 12-3-3 Green Belt
pdf
Figure 12-4 Visual Receptors
pdf
Figure 12-5-1 Blade Tip ZTV
pdf
Figure 12-5-2 Blade Tip ZTV Detail
pdf
Figure 12-5-3 Hub Height ZTV
pdf
Figure 12-5-4 Hub Height ZTV Detail
pdf
Figure 12-6 Residential Visual Amenity Assessment
pdf
Figure 13-1 Designated Heritage Assets (A-I)
pdf
Figure 13-2 Designated Heritage Assets (A-I)
pdf
Figure 13-3 Non-Designated Heritage Assets (A-R)
pdf
Figure 15-1 Construction Noise Assessment Locations
pdf
Figure 15-2 Operational Noise Assessment Locations
pdf
Figure 15-3 Cumulative Wind Turbine Locations
pdf
Figure 15-4 Substation Noise Assessment Locations
pdf
Figure 16-1 Study Area for Construction Dust
pdf
Figure 16-2 Study Area for Road Traffic Emissions
pdf
Figure 18-1 Index of Multiple Deprivation 2025
pdf
Figure 18-2 Health and Disability Deprivation Domain Index of Multiple Deprivation 2025
pdf
Figure 21-1 Calculation of Required Study Areas
pdf
Figure 21-2 Calculated Study Area and Assessment Area
pdf
Figure 21-2-1 (from Appendix 21-1) Shadow Effects on PRoW
pdf
Figure 21-3 Shadow Flicker Assessment Locations (SFALs)
pdf
Figure 21-4 Cumulative Assessment
pdf
Preliminary Environmental Information Report – Ornithology Appendix 9-1: Supporting Figures
Figure 01 – Site Location Plan
pdf
Figure 02 – Study Areas
pdf
Figure 03 – Vantage Point Locations
pdf
Figure 04 – Transect Routes
pdf
Figure 05 – Raptor Survey Vantage Point Locations
pdf
Figure 06 – Nocturnal Woodland Survey Locations
pdf
Figure 07 – Nocturnal Transect Routes
pdf
Figure 08 – Acoustic Monitoring Locations
pdf
Figure 09 – Designated Sites of Ornithological Importance
pdf
Figure 10 – Sensitive Nesting Areas – Golden Plover
pdf
Figure 11 – Sensitive Nesting Areas – Common Sandpiper
pdf
Figure 12 – Sensitive Nesting Areas – Curlew
pdf
Figure 13 – Sensitive Nesting Areas – Dunlin
pdf
Figure 14 – Sensitive Nesting Areas – Lapwing
pdf
Figure 15 – Sensitive Nesting Areas – Redshank
pdf
Figure 16 – Sensitive Nesting Areas – Ring Ouzel
pdf
Figure 17 – Sensitive Nesting Areas – Short-eared Owl
pdf
Figure 18 – Sensitive Nesting Areas – Snipe
pdf
Figure 19 – Sensitive Nesting Areas – Wheatear
pdf
Figure 20 – Sensitive Nesting Areas – Whinchat
pdf
Figure 21 – Sensitive Nesting Areas – Dipper
pdf
Figure 22 – Sensitive Nesting Areas – Grey Wagtail
pdf
Figure 23 – Sensitive Nesting Areas – Stonechat
pdf
Figure 24 – Sensitive Nesting Areas – Red Grouse
pdf
Figure 25 – Flight Activity – Black-headed Gull
pdf
Figure 26 – Flight Activity – Barn Owl
pdf
Figure 27 – Flight Activity – Common Gull
pdf
Figure 28 – Flight Activity – Common Sandpiper
pdf
Figure 29 – Flight Activity – Curlew
pdf
Figure 30 – Flight Activity – Dunlin
pdf
Figure 31 – Flight Activity – Little Egret
pdf
Figure 32 – Flight Activity – Great Black-backed Gull
pdf
Figure 33 – Flight Activity – Goshawk
pdf
Figure 34 – Flight Activity – Greylag Goose
pdf
Figure 35 – Flight Activity – Golden Plover
pdf
Figure 36 – Flight Activity – Herring Gull
pdf
Figure 37 – Flight Activity – Hen Harrier
pdf
Figure 38 – Flight Activity – Hobby
pdf
Figure 39 – Flight Activity – Kestrel
pdf
Figure 40 – Flight Activity – Lapwing
pdf
Figure 41 – Flight Activity – Lesser Black-backed Gull
pdf
Figure 42 – Flight Activity – Little Ringed Plover
pdf
Figure 43 – Flight Activity – Mallard
pdf
Figure 44 – Flight Activity – Merlin
pdf
Figure 45 – Flight Activity – Marsh Harrier
pdf
Figure 46 – Flight Activity – Oystercatcher
pdf
Figure 47 – Flight Activity – Peregrine
pdf
Figure 48 – Flight Activity – Pink-footed Goose
pdf
Figure 49 – Flight Activity – Red Grouse
pdf
Figure 50 – Flight Activity – Red Kite
pdf
Figure 51 – Flight Activity – Redshank
pdf
Figure 52 – Flight Activity – Short-eared Owl
pdf
Figure 53 – Flight Activity – Snipe
pdf
Figure 54 – Flight Activity – Teal
pdf
Figure 55 – Flight Activity – Woodcock
pdf
Figure 56 – Flight Activity – Whimbrel
pdf
Figure 57 – Flight Activity – Whooper Swan
pdf
Non-Statutory Consultation Summary Report
Non-Statutory Consultation Summary Report
pdf
7 MB
Appendix 1
pdf
1 MB
Appendix 2
pdf
718 KB
Appendix 3
pdf
115 KB
Appendix 4
pdf
412 KB
Appendix 5
pdf
7 MB
Appenix 6
pdf
138 KB
Other Documents
Calderdale Energy Park – Section 46 Notification
pdf
804 KB
Parish Council Forum
Calderdale Energy Park Parish Council Forum – Terms of Reference (April 2026)
pdf
317 KB
Calderdale Energy Park Parish Council Forum – Meeting Report 20.04.26
pdf
112 KB
Calderdale Energy Park Parish Council Forum – Meeting Report 12.05.26
pdf
100 KB
Programme Document
Calderdale Energy Park – Programme Document January 2026
pdf
916 KB
Scoping Report
Calderdale Energy Park Scoping Report – September 2025
pdf
20 MB
Webinar
Calderdale Energy Park – Public Webinar 2026/05/14
Non-Statutory Consultation Documents
Non-Statutory Consultation – Documents
Non-Statutory Consultation – Maps
Webinar
Non-Statutory Consultation – Documents
Newsletter
pdf
1 MB
Consultation Brochure
pdf
7 MB
Feedback Form
pdf
138 KB
Section 35 Direction
pdf
153 KB
Non-Statutory Consultation – Maps
Site location and context
jpg
10 MB
Proposed layout
pdf
9 MB
International & National Ecological Designations
pdf
11 MB
UK Habitat Survey
pdf
10 MB
Peat Depths
pdf
15 MB
Hydrology
pdf
11 MB
Public Access, Green Belt & Recreation
pdf
11 MB
Cultural Heritage – Statutory Designations
pdf
9 MB
Route Option A: Halifax 1
jpg
8 MB
Route Option A: Halifax 2
jpg
6 MB
Route Option B: Laneshaw Bridge
jpg
7 MB
Webinar
Non-statutory Consultation Webinar 2025/05/21
Get in touch
Community information line:
01422 702506
Monday to Friday, 9:00 am to 5:30 pm
Email us at:
info@calderdaleenergypark.co.uk
Monday to Friday, 9:00 am to 5:30 pm
Write to us:
Freepost CALDERDALE ENERGY PARK
Please note, no stamp or further address details are required
We use cookies to ensure that we give you the best experience on our website. Press accept if you’re happy to consent to these cookies, otherwise we will only use essential cookies whilst you use our website.